Site Prep

Site Clearing and Vegetation Removal

Brush, small trees, stumps, and debris cleared to property lines. Site ready for survey, stake-out, or rough grading. Most lots done in 1 to 3 days.

Cleared lot in Northern California ready for survey and rough grading.

Site clearing strips the lot down to dirt so survey, stake-out, and grading can start. Brush, small trees, blackberry, scotch broom, stumps, old fence lines, and construction debris all gone. Cleared to your property pins and hauled to a green-waste recycling yard, or piled for a controlled burn where the local fire authority allows it.

Brush to Stumps

Mulchers, grapples, and grubbing buckets. Stumps and root balls out, not just cut at grade.

To the Property Line

Marked and cleared to the corners. Survey and stake-out crew can move the next day.

Haul or Burn

Debris off the site to a green-waste yard, or piled for a controlled burn where allowed.

What We Clear

From Brush to Bare Dirt

Whatever's on the lot that shouldn't be there when survey and grading start. We pull it all.

Brush & Vegetation

Blackberry, scotch broom, manzanita, dense undergrowth. Mulched on site or hauled.

Trees & Stumps

Small trees up to about 30 feet. Stumps and root balls grubbed out to the root.

Old Fences & Debris

Old fencing, posts, junk piles, dump trash, leftover construction debris. Hauled clean.

Pre-Grading Prep

Lot rough-leveled and ready for survey, stake-out, or rough grading the next day.

What's Included

Every site clearing job covers the walk, the clear, and the haul. No surprise add-ons after we start.

  • Walk-through and property line confirmation before start.
  • Brush, vines, and small tree removal across the cleared zone.
  • Stump grubbing and root ball removal where called for.
  • Old fence, post, and construction debris removal.
  • Haul-off to a green-waste recycling yard, or burn pile if permitted.
  • Lot rough-leveled, ready for survey, stake-out, or grading.

Burn Permits and Fire Season: Handled

Most of Placer and Sacramento County restrict open burns May through October, and Cal Fire can pull permits with no notice during high fire danger. We coordinate the call with the local fire authority before we plan a burn pile. Default option is haul-off to a green-waste recycling yard, so the schedule does not depend on weather.

Pricing & Timeline

What It Costs and How Long It Takes

Real numbers per acre or per lot. Every quote is written and itemized.

Cost

How much does site clearing cost?

Site clearing in the Sacramento area runs roughly $1,500 to $15,000 for most residential lots. Lot size, vegetation density, and disposal method drive the price.

  • Quarter acre, light brush: $1,500 to $3,500
  • Half acre, moderate trees: $3,500 to $7,500
  • Full acre, mature trees and stumps: $8,000 to $15,000
  • Stump grubbing add-on: $200 to $500 each

Timeline

How long does clearing take?

Most residential lots clear in 1 to 3 days. Tight access or heavy stump grubbing pushes it to 4 days. Multi-acre development parcels run a week or more.

  • Quarter acre, light brush: 1 day
  • Half acre, moderate vegetation: 1 to 2 days
  • Full acre with stumps: 2 to 4 days
  • Multi-acre development: 1 to 2 weeks

Built for These Trades

Who Hires Us for Clearing

Lots cleared for builders and owners across Northern California.

Related Services

Clearing usually pairs with one of these next. Same crew, one number.

Common Questions

Site Clearing Questions Builders Ask

How much does site clearing cost in Sacramento?

Site clearing in the Sacramento area runs roughly $1,500 to $15,000 for most residential lots. A quarter acre of light brush is around $1,500 to $3,500. A full acre with mature trees and stump grubbing runs $8,000 to $15,000. Multi-acre development parcels are priced per acre. We send a written quote within 24 hours of the walk-through.

Do you grub stumps or just cut them at grade?

We grub stumps and root balls all the way out, not just cut at grade. The lot is left ready for grading or foundation work. If you want stumps left for landscape features, just say so in the scope and we will leave them.

Can you burn the debris instead of hauling?

Where the local fire authority allows controlled burns, yes. We pile debris in a clean burn pile sized to the permit. In most of the urban Sacramento and Placer area, burning is restricted year-round, so debris is chipped, hauled, or recycled at a green-waste yard. We coordinate the call with Cal Fire and the local district.

How long does site clearing take?

Most residential lots clear in 1 to 3 days. A quarter acre of light brush is one day. A full acre with mature trees and stump grubbing runs 2 to 4 days. Larger development parcels take a week or more depending on access, vegetation density, and disposal.

Ready to Clear It?

Send the Address and What's on the Lot

We send a written clearing quote within 24 hours on most jobs.