For Site & Civil Contractors

The Sub Site & Civil Crews Call When They're Stretched Thin

Engineered scopes, prevailing wage capable, weekend work available. We work to your foreman's plan, hit the spec, and stay in the sub lane. Three jobs going and only two crews? We're the third.

Excavation crew working a civil site development project in Northern California.

Site and civil contractors hire us when they're stretched across multiple jobs and need a sub who reads engineered drawings the right way. We run the scope to your foreman's plan, your specs, and your schedule. We do not card the homeowner, do not pitch the developer for follow-on work, and do not try to grow into your seat. You stay the GC, we stay the sub.

Engineered Scope, No Improvising

We read the stamped plans before the quote. Compaction, slope, depth, and material specs all to drawing.

Schedule Flex, Including Weekends

Saturday work, night shifts, off-hours pulls. If the inspection window is tight, we work it. Premium time priced up front.

Sub Lane Only, No Client Poaching

Your client stays your client. We work the scope and wait for the next call from your office.

What We Sub For

Spillover Phases You Can Hand Off Clean

When your dirt crew is locked on the big job, we handle the smaller phases.

Spillover Excavation

Footings, vaults, manholes, smaller mass cuts. When your A crew is on the big job, we work the rest.

Utility Tie-ins

Trenches for mainline taps, lateral runs, vault sets. Depths, widths, and bedding to engineer's spec.

Demo & Removal Phase

Existing structures, slabs, asphalt out before your team mobs. Recycled, written tickets on request.

Punch Phase Dirt

Drainage swales, finish corrections, cleanup grading. After your major work clears the inspector.

How We Work With Your Office

We run the way subs to civil GCs should run. Documented, on plan, on schedule, no drama.

  • We read the stamped plans and spec sections before we quote, not after.
  • Written quote within 24 hours, scoped to the spec sections that apply.
  • COI, prequal, and additional insured docs the same day you ask.
  • 811 locates and dig permits coordinated with your office, not over your head.
  • Compaction tests with the soils engineer, signed reports before we leave.
  • Your foreman's instructions take priority on site. We are not running the job.

We Stay in the Sub Lane

You don't need to worry about us flipping a job into a relationship that competes with you. We do not market to your homeowners, do not pitch your developer for the next phase, and do not bid against you on follow-on work. We work the scope, hand it back clean, and wait for the next call.

Pricing & Scheduling

How We Price and How Fast We Slot In

Built for the way civil GCs actually run jobs. Lump sum, T&M, prevailing wage when needed.

Pricing

Lump sum, T&M, or prevailing wage

Engineered scope is lump sum. Unknowns get NTE time and materials. Public works runs prevailing wage with certified payroll.

  • Lump sum on engineered scope, priced by spec section
  • T&M with not-to-exceed for unknowns (rock, water, buried debris)
  • Prevailing wage with certified payroll on public works
  • Progress billing tied to inspection milestones

Lead Time

How fast we can slot in

Loop us in early to lock the date. Tight schedules and inspection-driven windows, we adjust.

  • Standard scoped work: 1 to 2 weeks
  • Spillover when you're pinched: 3 to 5 days when possible
  • Weekend or night work: with notice, premium time priced up front
  • Phased work sized to inspection windows

Services Civil GCs Hire Us For

Pick a Phase or Bundle the Whole Scope

Most civil work combines 2 or 3 of these. One quote, one mobilization.

Related Trades

Same crew, same standards, different scope.

Common Questions

What Civil GCs Ask Before They Hire Us

Will you try to take our client?

No. We work the scope you give us, hand it back clean, and wait for the next call from your office. We do not market to your homeowners, do not pitch your developer for the next phase, and do not bid against you on follow-on work. You stay the GC, we stay the sub.

Can you run prevailing wage jobs?

Yes. We run prevailing wage on public works and on private jobs that require it. Certified payroll, DIR registration, and apprenticeship requirements handled. Send the wage determination with the bid package and we will scope and price accordingly.

Do you work to engineered spec sheets?

Yes. Send the stamped plans and the spec sections that apply. We read the drawings before we quote and hit the depths, slopes, compaction, and material specs called out. We coordinate compaction tests with the soils engineer and do not pour or pave over an unsigned compaction report.

Can you handle weekend or night work?

Yes. With notice we can run weekends, evenings, or split shifts when the inspection window or the schedule demands it. Premium time is priced into the quote up front so there are no surprises on the invoice.

Need a Spillover Crew?

Send the Plans, Specs, and Schedule

We send a written, itemized quote within 24 hours on most civil scopes.